Traffic advisory this weekend: Medford St. Bridge closure for GLX work and Cambridge St closed for Ribfest

Phase 1 of Green Line Extension (GLX) construction is underway and that will result in the complete closure of Medford Street, between South Street and Somerville Avenue, to all traffic on Saturday and Sunday this weekend (Oct. 5 & 6). During this time, vehicles will be redirected as follows:

  • Vehicles traveling south to Cambridge will proceed to the Somerville Avenue intersection and turn left at Somerville  Avenue onto McGrath Highway.
  • Vehicles traveling north into Somerville will be detoured left onto South Street to Windsor Place, right onto Webster Avenue, right onto Prospect Street, and onto Somerville Avenue.

Pedestrian access will also be restricted due to pubic safety concerns. As always, you can learn more about the GLX project on www.greenlineextension.com and click here for more details on the construction that will be conducted this weekend on the Medford Street Bridge.

Also, I’d like to remind you that Ribfest is being held this Sunday from noon to 4pm, which will result in the closure of Cambridge Street in East Cambridge, between Fulkerson Street and Fifth Street,  so keep that in mind if you’re driving to East Cambridge on Sunday.

 

Leave Comment

Your email address will not be published. Required fields are marked *